top of page
To see this working, head to your live site.
Why my raw material cost is coming with overhead cost.original+overhead?
In below case HDD 5000+500=5500
Why my raw material cost is coming with overhead cost.original+overhead?
In below case HDD 5000+500=5500
2 answers1 reply
Like
3 Comments
bottom of page
It’s Done.
Thank you!!
Seems there is a cost sheet attached to your costing variant, based on which your overheads are getting calculated. This is covered in detail in videos, please watch those